be able to complete multiple tasks at the same time
A tick box next to the task to be able to change the status or complete in bulk would save me a lot of time each month for sure
Would be good to have a not required option, i.e in onboarding you may have section in the workflow foe set up VAT. The client don't want VAT, then would be complete the section as not required
A tick box next to the task to be able to change the status or complete in bulk would save me a lot of time each month for sure
Would be good to have a not required option, i.e in onboarding you may have section in the workflow foe set up VAT. The client don't want VAT, then would be complete the section as not required